Question Details

(Solution Download) A Kaplan turbine delivering 40 MW works under a head of 35 m and runs at 167 rpm. The hub diameter..

Brief item decscription

Instant Solution Download for the question described below


Item details:

A Kaplan turbine delivering 40 MW works under a head of 35 m and
runs at 167 rpm. The hub diameter is 2.5 m and runner tip diameter is 5 m. The overall efficiency
is 87%. Determine the blade angles at the hub and tip and also at a diameter of 3.75 m.
Also find the speed ratio and flow ratio based on tip velocity. Assume ?H = 90%.

 







About this question:
STATUS
Answered
QUALITY
Approved
ANSWER RATING

This question was answered on: Oct 24, 2017

PRICE: $15.99

Solution~00017289303040.zip (18.37 KB)

Buy this answer for only: $15.99

Pay using PayPal (No PayPal account Required) or your credit card. All your purchases are securely protected by PayPal.
SiteLock

Need a similar solution fast, written anew from scratch? Place your own custom order

We have top-notch tutors who can help you with your essay at a reasonable cost and then you can simply use that essay as a template to build your own arguments. This we believe is a better way of understanding a problem and makes use of the efficiency of time of the student. New solution orders are original solutions and precise to your writing instruction requirements. Place a New Order using the button below.

Order Now
v>